Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
instrumentation:cvl:initial_specification [2016/01/18 06:39] kluong [Expectations] |
instrumentation:cvl:initial_specification [2021/09/19 21:59] (current) |
||
---|---|---|---|
Line 48: | Line 48: | ||
====== MVP ====== | ====== MVP ====== | ||
- | Since the initial project is being done in one semester a minimum viable product (MVP) must be built instead of a more polished prototype. See this page for more details: https://en.wikipedia.org/wiki/Minimum_viable_product | + | Since the initial project is being done in one semester a **minimum viable product** (MVP) must be built instead of a more polished prototype. See this page for more details: https://en.wikipedia.org/wiki/Minimum_viable_product |
Think about how we can build something that will be of benefit to the most people. Someone should ultimately at the end find some use out of the tool - polishing of the tool, regardless of hardware or software can be accomplished after we have something that is done. | Think about how we can build something that will be of benefit to the most people. Someone should ultimately at the end find some use out of the tool - polishing of the tool, regardless of hardware or software can be accomplished after we have something that is done. |