weatherbox:bumblebee:week_3_-_january_29_2018

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
weatherbox:bumblebee:week_3_-_january_29_2018 [2018/02/02 19:41]
awong [Meeting Minutes February 2, 2018]
weatherbox:bumblebee:week_3_-_january_29_2018 [2021/09/19 21:59] (current)
Line 22: Line 22:
   * PCB order was kicked back due to a trace size issue with the voltage regulator   * PCB order was kicked back due to a trace size issue with the voltage regulator
         * Issue was addressed, order processed on February 1st         * Issue was addressed, order processed on February 1st
 +  * Learned about range testing
 +  * Filled out EE 496 Poster Session form
  
 ===To Do=== ===To Do===
-  * Set up a meeting with the Housing Team +  * Proposal Presentation tomorrow, February 3rd 
-  * Run various tests +  * Begin firmware modifications 
-  * Populate boards once they arrive+
  • weatherbox/bumblebee/week_3_-_january_29_2018.1517600495.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)