weatherbox:bumblebee:week_9_-_march_11_2019

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
weatherbox:bumblebee:week_9_-_march_11_2019 [2019/03/15 02:20]
mmansanao created
weatherbox:bumblebee:week_9_-_march_11_2019 [2021/09/19 21:59] (current)
Line 11: Line 11:
           - Results: We measured distances for each hallway in the 4th floor. When conducting the first hallway, no packets were received at all due to the major thickness of walls and other variables. As a result, we stopped this test.            - Results: We measured distances for each hallway in the 4th floor. When conducting the first hallway, no packets were received at all due to the major thickness of walls and other variables. As a result, we stopped this test. 
       - Alternative location       - Alternative location
-        - We decided to just test two walls. First wall is from break room to SCEL lab and all packets were received. ​Lastly, the second wall is from break room to hallway (view is POST) and packets were 93% received. ​+        - We decided to just test two walls. First wall is from break room to SCEL lab and all packets were received. ​Second, the second wall is from break room to outside of HH491 and packets were 93% received. ​Lastly, the outside of SCEL and HH486 and no packets were received ​
    
 * Searched specification of XBees range * Searched specification of XBees range
Line 24: Line 24:
  
 === Updates ===  === Updates === 
-  * +  * Went over Bumblebee'​s codes with firmware team  
 +    * Alicia and Kylie went through the relay code with us and explained what every part of the code does. 
 +    * Comments and such are on our Github relay code. 
  
 ===To Do=== ===To Do===
-  * +  * PCB is set to come in some time during break or right after break.  
 +    * Solder and debug PCB 
  • weatherbox/bumblebee/week_9_-_march_11_2019.1552616459.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)