weatherbox:guava:week_12_-_april_4_2022

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
weatherbox:guava:week_12_-_april_4_2022 [2022/04/08 03:42]
changjul
weatherbox:guava:week_12_-_april_4_2022 [2022/04/08 03:49] (current)
changjul
Line 5: Line 5:
  
 ==== Thursday April 7th, 2022 ==== ==== Thursday April 7th, 2022 ====
-Members present: ​+Members present: ​Alex, Marvin, Donovan, Juliana  
 +  * 296 (Elle and Dylan) shadowed
   * bootloaded and tested new Rev DII board   * bootloaded and tested new Rev DII board
   * Declared blue dot board as dysfunctional;​ do not continue testing with it   * Declared blue dot board as dysfunctional;​ do not continue testing with it
   * Breaking the connection on the PCB to Vboard (free floating) causes battery and solar panel voltages to result in incorrect readings   * Breaking the connection on the PCB to Vboard (free floating) causes battery and solar panel voltages to result in incorrect readings
          * using the voltage divider: battery voltage results in about 3.3V           * using the voltage divider: battery voltage results in about 3.3V 
 +                  * need to bring value below Vcc
  • weatherbox/guava/week_12_-_april_4_2022.1649389324.txt.gz
  • Last modified: 2022/04/08 03:42
  • by changjul