weatherbox:dragonfruit:meeting_minutes_january_17_2017

This is an old revision of the document!


Attended: Kevin, Gordon, Tyler

  • all of them
  • Test XBee transmission when in contact with metal and without
  • Reprint housing bottom and Solar Panel holders (put holes in the screw places)
  • Use diode to avoid power from XBee
    • Find an appropriate diode
    • Find out where MCU could be powering the XBee from
  • Program Dragonfruit board 5
  • Measure for shorts
    • Oscilloscope
    • Talk to Ohta about possible plane tunneling issues
  • Figure out if repeated use damages/degrades the performance of the board
  • Test board after replacing Charging Chip
  • Find surface mount charging chip part (redesign board to use this part, may solve shorting issues)
  • Finalize Eagle schematics of GPS and RTC
  • weatherbox/dragonfruit/meeting_minutes_january_17_2017.1484872021.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)