This is an old revision of the document!
Team Asteroid
Introduction
Team Asteroid is an EE296 Weatherbox team under Smart Campus Energy Lab (SCEL), a Vertically Integrated Project (VIP) at the University of Hawaii at Manoa. This team is comprised of two Electrical Engineering students, Gordon Li and Kevin Wong, and a Computer Engineering student, Nathan Lam, mentored by Brian Chan.
Goals for Spring 2016
Develop skills in software/hardware design, communication, time management, teamwork, and leadership.
Block Diagram
Parts Data Sheet
Parts | Data Sheet Links |
---|---|
Microprocessor | Atmel Atmega328P |
Transceiver | https://www.adafruit.com/datasheets/XBee%20ZB%20User%20Manual.pdf |
Battery | https://www.adafruit.com/images/product-files/353/C450_-_ICR18650_6600mAh_3.7V_20140729.pdf |
Solar Irradiance Sensor | http://www.apogeeinstruments.com/content/SP-212_215manual.pdf |
Temperature Sensor | https://datasheets.maximintegrated.com/en/ds/DS18B20.pdf |
Charging Circuit | https://www.adafruit.com/datasheets/MCP73871.pdf |
Humidity Sensor | https://www.adafruit.com/datasheets/Sensirion_Humidity_SHT1x_Datasheet_V5.pdf |
Pressure Sensor | https://www.adafruit.com/products/1603 |
FTDI Bootloader | https://learn.adafruit.com/usb-dc-and-solar-lipoly-charger |
FTDI drivers | https://www.sparkfun.com/products/retired/8772 |
—-
Sensor libraries
Parts | |
---|---|
Pressure Sensor | Pressure sensor |
Humidity Sensor | Humidity sensor |
Parts
Parts | Website Information |
---|---|
Microprocessor | http://www.atmel.com/images/atmel-8271-8-bit-avr-microcontroller-atmega48a-48pa-88a-88pa-168a-168pa-328-328p_datasheet_complete.pdf |
Transceiver | XBee Pro Series 2b - RPSMA |
Antennae | 2.4 GHz RP-SMA Duck Antennae |
Charging Circuit | Adafruit 390 |
Solar Panel | Adafruit 1525 |
Battery | Tenergy 18650 3.7V 6600mAh |
Solar Irradiance Sensor | Apogee SP-215 |
Temperature Sensor | Maxim DS18B20 |
Humidity Sensor | https://www.adafruit.com/datasheets/Sensirion_Humidity_SHT1x_Datasheet_V5.pdf |
Pressure Sensor | https://www.adafruit.com/products/1603 |
—-
Power Budget/Build of Materials
Resources
Presentations
Team Asteroid Proposal Presentation [First All Hands Meeting]
https://docs.google.com/presentation/d/1EFmzMGaVXCPBBi4t7PjaQgQbxEdI47Y66orNPXxJXIw/edit#slide=id.p [Preliminary Design Review]
Videos
XBee
Meeting Minutes
Meeting Minutes March 14, 2016
Meeting Minutes March 7, 2016
Meeting Minutes February 29, 2016
Meeting Minutes February 22, 2016
Meeting Minutes February 17, 2016
Meeting Minutes February 8, 2016
Meeting Minutes February 1, 2016
Meeting Minutes January 25, 2016
Meeting Minutes January 20, 2016