Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
weatherbox:bumblebee:week_12_-_november_20_2017 [2017/11/20 18:43]
iaribal
weatherbox:bumblebee:week_12_-_november_20_2017 [2021/09/19 21:59] (current)
Line 5: Line 5:
 **Attended: Isaiah, Kayla, Rebecca** **Attended: Isaiah, Kayla, Rebecca**
   * Planned meeting with Dr. Kuh Wed 11/22 3:00pm   * Planned meeting with Dr. Kuh Wed 11/22 3:00pm
 +  * Finalized housing design
 +    * Modular design
 +      * Hexagon casing
 +      * Platform with rails and holes for stands
 +      * Solar panel attachment with stands to attach to platform
 +    * Hexagon shaped casing (3 1/4" x 4 1/2")
 +    * Hexagon stands up that attaches to a platform at the bottom using rails
 +    * Solar panel sits above the hexagon with on end flush to side of the hexagon
 +      * On antenna side to allow it to extend straight up instead of at an angle
 +    * PCB sits on a platform on the inside of the hexagon towards the bottom
 +    * Back of hexagon (side under solar panel) will be a removable cover 
 +
 +====November 22, 2017====
 +**Attended: Isaiah, Kayla, Rebecca**
 +  * Range Testing
 +  * Meeting with Dr. Kuh
 +
  
  • weatherbox/bumblebee/week_12_-_november_20_2017.1511203406.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)