weatherbox:bumblebee:week_4_-_september_26_2021

This is an old revision of the document!


Attended: Yin, Thiri, Brian , Yucheng , ZhongKeng

Updates

  • PCB Design using Eagle

To Do

  • Work on the PCB design for v. 4.2
  • Order parts

Attended: Yin, Thiri, Brian , Yucheng , ZhongKeng

Updates

  • Meet with Dr.Kuh
  • Finish the PCB board
  • Place order

To Do

  • organize the parts we need for the board
  • weatherbox/bumblebee/week_4_-_september_26_2021.1633283044.txt.gz
  • Last modified: 2021/10/03 17:44
  • by tthiri