weatherbox:bumblebee:week_9_-_march_28_2021

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
weatherbox:bumblebee:week_9_-_march_28_2021 [2021/03/30 02:17]
lcorpuz
weatherbox:bumblebee:week_9_-_march_28_2021 [2021/09/19 21:59] (current)
Line 27: Line 27:
   * Test v4.0 w/ other hardware teams   * Test v4.0 w/ other hardware teams
  
-==== Meeting Minutes March 14, 2021 ====+==== Meeting Minutes March 28, 2021 ====
 **Attended: Lauryn, Francis, Brian, Thiri, Yin** **Attended: Lauryn, Francis, Brian, Thiri, Yin**
  
 === Updates ===  === Updates === 
-  * Worked ​4.1 in pspice+  ​* Backed up Bumblebee files from computer lab onto Spring 2021 bumblebee google drive folder  
 +  ​* Worked ​on v4.1 in pspice; creating simulation design ​
   * attempted to configure many to one network   * attempted to configure many to one network
-  * Links: +  * Links for Many-to-One research
-       ​* ​Unordered List Itemhttps://​www.instructables.com/​XBee-Mesh-Network-Construction/​+       ​* ​https://​www.instructables.com/​XBee-Mesh-Network-Construction/​
        * https://​www.digi.com/​resources/​documentation/​digidocs/​pdfs/​90001526.pdf        * https://​www.digi.com/​resources/​documentation/​digidocs/​pdfs/​90001526.pdf
        * https://​www.digi.com/​resources/​documentation/​digidocs/​pdfs/​90001942-13.pdf        * https://​www.digi.com/​resources/​documentation/​digidocs/​pdfs/​90001942-13.pdf
Line 43: Line 44:
 === To Do ===  === To Do === 
   * Continue design in pspice   * Continue design in pspice
-  * continue ​to try to do many-to-one network ​+  * Research on Many-to-One Network  
 +  * Attempt ​to set up XBee as many-to-one network ​
  
 ==== Meeting Minutes March 29, 2021 ==== ==== Meeting Minutes March 29, 2021 ====
Line 51: Line 53:
   * Worked on CDR presentation ​   * Worked on CDR presentation ​
   * Meeting up in lab on Friday, April 2nd, from 9am - 1pm    * Meeting up in lab on Friday, April 2nd, from 9am - 1pm 
 +  * cancelled lab on Sunday, April 4th. 
 === To Do === === To Do ===
   * research on many-to-one network   * research on many-to-one network
  • weatherbox/bumblebee/week_9_-_march_28_2021.1617070678.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)