Attended: Keane, Kevin, Tyler

  • Soldered more parts onto PCB #5, version 2
    • Schematic previously followed found to be for version 1
    • Version 2 schematic and eagle files found, soldering will continue
    • Parts on each version are relatively the same, therefore no major changes need to be made
  • Found a fully soldered version 2 Dragon Fruit PCB on solder bench, labeled as #3
  • Previously, board #4 was being used to program and deploy, but failed proved to be faulty and stopped transmitting after being handled
  • Board #3 fully programmed without any problems
    • Board #3 continues to transmit even after being completely disconnected, then reconnected (board #4 would need to be reprogrammed if this was done)
    • Board #3 deemed as deployable by firmware
      • XBee, Sensors, and Housing ready for deployment
      • Waiting for key to get to roof
  • Solved many problems this week
  • Board #4 still buggy and faulty
  • Resolved problem of having the wrong schematic version for the PCB design
  • Deploy board as soon as we have access to roof (before CDR)
  • Start creating CDR presentation
    • complete by Wednesday November 9th
  • Continue soldering on board #5
  • Draft a new PCB with Real Time Clock and GPS
    • Look for GPS that can idle
    • to solve space issue consider another tier of parts
      • consider creating another tier on sensor board
      • same connections to MCP through SDA and SCL

Authors

Contributing authors:

tyamauchi

Created by tyamauchi on 2016/11/04 11:17.

  • weatherbox/dragonfruit/meeting_minutes_november_3_2016.txt
  • Last modified: 2021/09/19 21:59
  • (external edit)