-We met with our group via Discord to update our Wiki meeting minutes. Worked on documentationwhile Oni and Dane worked on REV-D2.  ​+We met with our group via Discord to update our Wiki meeting minutes. Worked on documentation while Oni and Dane worked on REV-D2.  ​
    
 //Members: Blake, Max, Riley, Oni, and Dane //Members: Blake, Max, Riley, Oni, and Dane
Line 7: Line 7:
  
 ==== April 15 2021 ==== ==== April 15 2021 ====
 +We decided to cut the bad trace and solder a wire connected to the pad in the back of the board to the correct pin on the atmega on our REV-DI board. We tried to get the board to send properly to the gateway but were unsuccessful. We tried re-bootloading the board and uploading the code, but it still only sent 1 heartbeat packet. So we are planning to go into the next lab and check to see if we soldered on the wire to the correct pin. 
  
 //Members: Blake, Max, Riley, Oni, and Dane //Members: Blake, Max, Riley, Oni, and Dane
  
 //Time: 5:30 PM - 8:30 PM //Time: 5:30 PM - 8:30 PM
  • weatherbox/guava/week_13_-_april_12_2021.1618362750.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)