weatherbox:guava:week_5_-_september_29th_2019

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
weatherbox:guava:week_5_-_september_29th_2019 [2019/10/08 23:54]
aereno created
weatherbox:guava:week_5_-_september_29th_2019 [2021/09/19 21:59] (current)
Line 1: Line 1:
 =====October 1st, 2019===== =====October 1st, 2019=====
-The team got down to going through each part that they have in the box and the lab to figure out what to put on the order listIt seems like the build took up a few of the current supply and our target goal of 3-4 boards would not be satisfiedAlso started ​updating ​the PCB design to accommodate ​for the larger capacitor and resistors, which are the only parts that are changing+Since the board is currently a mess of dangling wires there is a large possibility of losing connection. This was apparent when some of wires lost their solder ​and as such the wire needed more solderingAlso, from initial testing it seems like the RTC was not working as intended since it was actually sending signals to other components. This will be taken into effect when redoing the PCB designWe also started the slides ​for this Saturdays Preliminary Design Review
  
 =====October 3rd, 2019===== =====October 3rd, 2019=====
-Further refining the PCB design and the spreadsheet ​for the partsIt would seem like this would take another 2 weeks of work, but with the Preliminary Design Review looming around ​the team will have to focus to get something presentable.+Our first revision of Revision C IV is now out. We also finished setting up our slides ​for the following PDRFinally we were able to start programming ​the board because we believed we finished troubleshooting ​the problems of the board
  • weatherbox/guava/week_5_-_september_29th_2019.1570578885.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)