Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
weatherbox:guava:week_8_-_march_9_2020 [2020/04/09 23:57]
dlin [March 11th, 2020]
weatherbox:guava:week_8_-_march_9_2020 [2021/09/19 21:59] (current)
Line 4: Line 4:
 Overall, we purchased our PCB and stencil from OSH park and ideally we would have all the parts once we get back from spring break and we can start our soldering. Right now, we need Dr. Kuh to sign our part list forms. ​ Overall, we purchased our PCB and stencil from OSH park and ideally we would have all the parts once we get back from spring break and we can start our soldering. Right now, we need Dr. Kuh to sign our part list forms. ​
  
-//Members: Diwen, ​Rylie, Max//--+//Members: Diwen, ​Riley, Max// 
 //Time: 3:30PM - 5:30PM// //Time: 3:30PM - 5:30PM//
  
 =====March 12th, 2020===== =====March 12th, 2020=====
 +We spent most of our time today finish up our mid-semester report, https://​docs.google.com/​document/​d/​1BJfk7nlmC8z0OPYRlWHHfE7YvuVI6M2aKigz2uSYYsQ/​edit,​ and looking for any other potential trace errors we missed out before we purchase the PCB and stencil.
 +
 +So far Team Guava finished Bare Guava, documented how to boot-load ATMEGA 1284P with 8Mhz and 5V, fixed trace errors with the solar charging chip, uniform all the capacitors and resistors to 0805, REV D design and parts. ​
  
 +//Members: Diwen, Riley, Max//
  
-//Members: Diwen, Rylie, Max//-- 
 //Time: 1:00PM - 4:00PM// //Time: 1:00PM - 4:00PM//
  
  • weatherbox/guava/week_8_-_march_9_2020.1586476678.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)