Xbee Team Meeting #22 - March 31, 2016
Attended: Ernesto, Kaeo, Tyrin, Tryston, Michael
Updates
- Tested XBees while it was sunny
- Tested in same location (Holmes 1st floor) as tests in the rain to minimize variables
- Data gathered every 30 ft.
- Soldered on RP-SMA Connector
- RSSI values affected greatly with RP-SMA connector soldered on
Problems
- RSSI values affected greatly when soldering on RP-SMA Connector
- Need to find different alternative
Reminders
- CDR Presentation on Saturday, April 2, 2016
- Upload CDR presentation on drive