This is an old revision of the document!


Team Guava absorbed Diwen, a member from team Grasshopper EE 296. This introductory meeting was to orient Diwen into Guava's philosophy and the current state of Revision C. Since the device hasn't been ran ever since last spring semester we took the time to jerry-rig up a way to see if the board still works and charge a specific battery.

  • weatherbox/guava/week_1_-_september_1st_2019.1567577940.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)