weatherbox:bumblebee:week_13_-_april_16_2018

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
weatherbox:bumblebee:week_13_-_april_16_2018 [2018/04/16 19:45]
awong created
weatherbox:bumblebee:week_13_-_april_16_2018 [2021/09/19 21:59] (current)
Line 12: Line 12:
     * Measure current/​voltages to and from the panel with the battery and simulated sunlight     * Measure current/​voltages to and from the panel with the battery and simulated sunlight
   * Possibly deploy second board   * Possibly deploy second board
 +
 +==== Meeting Minutes April 20, 2018 ====
 +**Attended: Alex(s), Kayla, Becky**
 +
 +=== Updates === 
 +  * Tested previously deployed Bumblebee with solar light in the lab
 +  * Removed voltage regulator on board to see if the problem was a current draw problem
 +  * Attempted to use a through hole voltage regulator with a higher current output
 +  * Tested other board with solar light to see if that board also had a problem
 +  * Noticed that second board'​s voltage from the solar charging chip would fluctuate when the board or panel would be moved
 +  * Noticed the male barrel jack on the solar panel that was deployed was broken
 +  * Tested board with new panel and there was no buzzing like there was on the deployed board
 +  * Voltages on board with new panel stayed constant
 +
 +===To Do===
 +  * Test new board with new panel to see if it can send packets
 +  * Replaced voltage regulator on first board
 +  * Create a new housing for second board
 +  * Deploy!
 +
  • weatherbox/bumblebee/week_13_-_april_16_2018.1523907917.txt.gz
  • Last modified: 2021/09/19 21:59
  • (external edit)